  1. Testing of Nano liquid complex fertilizers (N-K and P-K) for cereals
    Sponsored by: Aarshanano Composite Technologies Pvt. Ltd., AP
    Duration: 21-02-2022 to 20-08-2022
    Position: Co - Principal Investigator

Completed Consultancy Projects:
  1. Validation of Remote Sensing Technology Based Crop Yield Estimation
    Sponsored by: Greenthink Ventures Pvt. Ltd., Kolkata
    Duration: 15-02-2021 to 02-08-2021
    Position: Principal Investigator
  2. Probable maximum flood estimation for Nagarjunasagar Dam
    Sponsored by: Government of Andhra Pradesh
    Duration: 2010-2011
    Position: Principal Investigator
  3. Setting-up RiverWare model for operational management and climate change impact assessment of Damodar river basin reservoirs
    Sponsored by: The World Bank, New Delhi
    Duration: 2018-2019
    Position: Co-Principal Investigator
  4. Testing and evaluation of the Internet of Things (IOT) based prototype designed for water management in Alternate Wetting and Drying (AWD) rice
    Sponsored by: The World Bank, New Delhi
    Duration: 2018-2019
    Position: Co-Principal Investigator
  5. Evaluation study on the activities of Soil Conservation
    Sponsored by: DVC, Hazaribagh
    Duration: 2007-2009
    Position: Co-Principal Investigator
  6. Intervention analysis of the IGB basin focal project
    Sponsored by: International Water Management Institute, Sri Lanka
    Duration: 2008-2009
    Position: CO-Principal Investigator
  7. Impact assessment of MGNREGA in one district of Madhya Pradesh (Mandla) & West Bengal
    Sponsored by: Ministry of Rural Development (MORD), UNDP, New Delhi
    Duration: 2011-2012
    Position: CO-Principal Investigator
  8. Hydrological study of NTPC Kahalgaon power station area
    Sponsored by: NTPC, Kahalgaon
    Duration: 2000-2000